Reports to: Project Manager, Chargehand, or Foreman on site
Key Responsibilities: Adhering to commands from the Foreman or Charge Hand and installation, termination,and testing of Cat6 and Cat6a cables . Installation of Fibre Optic Cable. Ability to deliver a project on time and on budget.
Responsibilities:
• The installation of Cat6 and Cat6a structured cabling, testing of installation with a Fluke Cable Analyser
and terminating fibre optic cabling
• Installation of Fibre Optic Cable. Testing of installation with Fluke DSX
• Read and understand construction drawings
• Terminate copper cable
• Test copper cables
• Test Fibre Cables
• Ability to work on own initiative
• Liaise with client if necessary
• Ensure all Health & Safety precautions are adhered to
• Ensure all security procedures are strictly adhered to
• Wear PPE as specified by the manager
• Be prepared to work on any of the sites serviced by CET Ltd, home or abroad.
• Travel is a requirement of the position
• Carry out any general duties or ad hoc duties as assigned
General Requirements for the position:
• Must have a valid safe pass
• Must have up to date Manual Handling Certificate
• Working at Heights an advantage
• MEWP or Hoist Operator training (not essential but would be an advantage)
• Own transport an advantage